ARCEP Engineering Ltd has accomplished its Data Collection task under the SP-ARCEP Sub-consultancy Agreement on the WAPP Project (Feasibility Study and Preparation of Bidding Documents for WAPP 330kV Double Circuit Median Interconnection). On 10th October 2021, ARCEP formally submitted the Report of the Data Collection to Studio Pietrangeli (SP), the principal consultant for the project.
It took approximately four months (June 2021 – September 2021) to accomplish the data collection and collation. The report was compiled into two files as follows:
Studio Pietrangeli on 17th November 2021 formally accepted the report with satisfaction.